Public Participation in the Second Publicity of Environmental Impact Assessment of 300 Tons of Environmentally Friendly Ethicin Project of Shensheng
Release time:2024-06-19
According to the "the People's Republic of China Environmental Impact Assessment Law", "Construction Project Environmental Protection Management Regulations", "Environmental Impact Public Participation Measures", the relevant information of "Nanyang Holy Agrochemical Technology Co., Ltd. annual output of 300 tons of environmentally friendly ethylicin project" is now available Publicity.
According to the "the People's Republic of China Environmental Impact Assessment Law", "Construction Project Environmental Protection Management Regulations", "Environmental Impact Public Participation Measures", the relevant information of "Nanyang Holy Agrochemical Technology Co., Ltd. annual output of 300 tons of environmentally friendly ethylicin project" is now available Publicity.
1. project construction background
Nanyang holy agrochemical technology co., ltd. has an annual output of 300 tons of environment-friendly ethylicin project, which is located in the logistics road of Anpeng chemical professional park, Tongbai county, Nanyang city, Henan province, covering an area of 10487 m2. The project is mainly for the production of 300 tons of environmentally friendly ethylicin. The total investment of the project is 60 million yuan. After the completion of the project, it can increase the local employment rate, provide jobs for the local people, improve the local economic development level, and improve the production and living conditions of the regional people.
Environmental impact of 2. engineering construction
1. Environmental impact during construction
The environmental impacts during the construction period mainly include noise, dust and solid waste. Environmental protection during the construction period focuses on environmental management. After effective measures are taken, reasonable construction time is formulated, and management is strengthened, the impact on the surrounding environment during the construction period can be controlled within the scope of relevant national standards and requirements. Therefore, the environmental impact during the construction period is relatively small.
2. Environmental impact during the operation period
The main environmental impacts during the operation period are:(1) waste gas, alkylation reaction waste gas, non-methane total hydrocarbons; oxidation reaction waste gas, mainly NOx and a small amount of non-methane total hydrocarbons; in addition, there are canteen fumes. (2) Wastewater, mainly production wastewater and domestic sewage. (3) noise, mainly for the reactor and all kinds of fans, pumps generated equipment noise. (4) Solid waste, mainly domestic waste, waste packaging materials, etc.
Environmental protection measures to be taken by the 3.
Environmental protection measures to be taken for the impact of the project during the operation period:
1. Waste gas: including production waste gas and canteen oil fume. The main pollutants of production waste gas are NOx and a small amount of non-methane total hydrocarbons. A gas collecting hood is set in the workshop. After collection, NOx and a small amount of non-methane total hydrocarbons are purified and treated by "6-stage water washing and 1-stage alkali washing activated carbon adsorption" and discharged up to the standard through the chimney. Canteen oil fume is treated by oil fume purifier and discharged to the chimney roof.
2. Wastewater: The wastewater of this project is mainly production wastewater, domestic sewage and ground flushing water. After the project wastewater is collected, it enters the enterprise's self-built sewage treatment station and is treated by the "double-effect evaporation Fenton oxidation UASB anaerobic aerobic" treatment process. After reaching the water collection standard of the park sewage treatment plant, it is discharged into the park sewage treatment plant where the project is located through the sewage pipe network.
3. Noise: Noise reduction measures such as sound source control, plant sound insulation, foundation vibration reduction and greening sound absorption are adopted for the equipment noise of this project to reduce the impact of project noise on the surrounding environment.
4. Solid waste: The domestic waste of this project shall be handed over to the sanitation department for disposal in time, and hazardous waste shall be temporarily stored in the temporary storage room and regularly handed over to qualified units for disposal. The treated solid waste will not have a greater impact on the surrounding environment.
Internet links to 4. the full text of the draft of the environmental impact report and the ways and means of consulting the paper version of the report
The public can contact the construction unit or environmental impact assessment agency by email or by telephone, fax, letter, etc. to consult the paper report. Or download the full text of the draft report through the network link, the network link is:http://www.nyssnh.com/Articles-158144.html
Scope of the public and main matters for which the 5. solicits opinions
Units and individuals affected by the project and those concerned about the construction of the project.
Main matters: This announcement mainly solicits the public, experts and social organizations to put forward their own views and opinions on the possible impact on the environment during the construction and operation of the project.
Web link to 6. public comment form
The public opinion form is uniformly formulated by the Ministry of Ecology and Environment of the Ministry of the People's Republic of China and can be downloaded from the official website of the Ministry of Ecology and Environment. The online link is:http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html.
Ways and means of 7. public input
After filling in the public opinion form downloaded from the Ministry of Ecology and Environment, the public can submit it to our company by letter, optional, telephone contact with the construction unit to pick up the pieces. In the process of preparing the draft of the environmental impact report, the public can put forward opinions related to the environmental impact assessment to our company.
Mail or self-delivery address: Nanyang holy agricultural chemical technology co., ltd., anpeng chemical professional park, Tongbai county, Nanyang city
Construction unit: Nanyang Sacred Agrochemical Technology Co., Ltd.
Contact: Zhang Changxing
Contact number: 13333669329
E-mail: 1459436237@qq.com
Start and end time for 8. public comments
Within 5 working days from the date of this announcement, the public can fill in the public opinion form of the construction project (see the network link), and submit the completed public opinion form to the construction unit by mail letter (subject to the postmark date), fax, etc. Please indicate the date of publication, real name and contact information
Nanyang Sacred Agrochemical Technology Co., Ltd.
April 22, 2019
Related Blog
As an "old pesticide" born in 1958, Ethyl Allicin is a broad-spectrum biomimetic fungicide independently developed in China, offering advantages such as high efficiency, broad-spectrum activity, zero resistance, and eco-friendliness.
2025-11-17
Invitation to the 39th China Plant Protection Information Exchange and Pesticide & Equipment Trade Fair
2025-11-15
Nanyang sacred agrochemical technology co., ltd. invites you to visit our booth!
Nanyang holy agrochemical technology co., ltd. will attend the 38th China plant protection information exchange meeting from 22 to 24 this month!
2024-11-04